Laserfiche WebLink
aFaylx 1./ • `[ <br /> r' �i P.O.BOX 1810-1810 E.Hp2ELTON AVENUE <br /> THOMAS R. FLINN �I� l. STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR AL <br /> - (209)468-3000 FAX(209)488-2999 <br /> A�c , - �• � wwwslgov.org/pubworks <br /> THOMAS M.GAU <br /> j W%� <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO Worlemg for YOU <br /> DEPUTY DIRECTOR RECEIVED <br /> STEVEN VANKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES APR 1 3 2009 <br /> BUSINESS ADMINISTRATOR <br /> Oommunl#y Development Dept. <br /> April 13,2009 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Bill DuBois, Engineer HI l <br /> Public Services Division <br /> SUBJECT: PA-0900046; A Use Permit application for a six-site recreational use vehicles park for agri-tourism; all <br /> outdoor recreational activities are carried out in conjunction with the non-permanent structures or <br /> buildings are being proposed., located . (Supervisorial District, <br /> PROPERTY OWNER: David L. &Patricia H. Pechan Trust APPLICANT: J&P Engineering <br /> ADDRESS: 24837 E. Milton Road,Linden APN: 093-140-08 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Milton Road has an existing right-of-way width of 60-feet and a planned right-of-way width of 60-feet. <br /> RECOMMENDATIONS: <br /> 1. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties. Retention basins shall be fenced with six(6)foot high chain link fence or equal when the <br /> maximum desr' depth is 18 inches or more. Required retention basin capacity shall be calculated by a <br /> registered civil engineer,licensed contractor or licensed architect prior to release of Building Permit. <br /> (Development Title Section 9-1135) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolutions R-00- <br /> 433) <br />