My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006479
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
21080
>
2600 - Land Use Program
>
PA-0700100
>
SU0006479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 9:14:17 AM
Creation date
9/6/2019 10:17:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006479
PE
2631
FACILITY_NAME
PA-0700100
STREET_NUMBER
21080
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20915026
ENTERED_DATE
3/15/2007 12:00:00 AM
SITE_LOCATION
21080 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
3/15/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\21080\PA-0700100\SU0006479\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u ..Oe <br /> Chandler Martin -2- <br /> COMMIJNITY DEVELOPMENT <br /> PA-06-100 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$224.47 per additional daily trip-end generated in <br /> the Tracy area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions 00-433) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$131.00 per 1000 gross square foot of building. <br /> The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. Applicant shall provide evidence of approval of the driveway by the West Side Irrigation District,prior to <br /> approval of the Final Site Plan. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:av <br /> P.1COhN4NfS1SMYR 2007\PA-0700100 A"UCATION.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.