Laserfiche WebLink
2. Record Drawings: Record Drawings shall be provided prior to acceptance of the <br /> improvements by the MHCSD. Record Drawings shall also be provided in digital format <br /> consistent with MHCSD File Format. <br /> 3. Final Mao Digital File: A digital file of the Final Map shall be submitted to the MHCSD and <br /> to the Community Development Department. The digital file format shall be consistent with <br /> requirements of the County Assessor and Community Development Department GIS <br /> division and the MHCSD digital file format. Condition shall be met prior to approval of Final <br /> Map. <br /> 4. Geotechnical Report: All infrastructure designs shall be shown on the grading and <br /> improvement plans and shall comply with and incorporate the recommendations of the <br /> Geotechnical Engineering Studies. Condition shall be met before approval of Final Map. <br /> 5. Environmental Hazards: Comply with all recommendations of the Environmental Site <br /> Assessment prepared for the project. Condition shall be met prior to beginning any <br /> construction on the related final map. <br /> 6. Agricultural Drainage Improvement Phasing: A Surface and Subsurface Drainage <br /> Facilities Relocation and Improvement Plan for Tract 3481 and adjacent areas shall be <br /> submitted to and approved by BBID and Mountain House Community Services District <br /> (MHCSD)General Manager. The plan shall include but not be limited to the following: <br /> A. Phasing for relocation and improvement of surface and subsurface drainage facilities. <br /> B. Locations and timing; <br /> C. Identification of"dewatering"areas and temporary or permanent methods for the <br /> dewatering system and connections to the storm water collection system as determined <br /> necessary by the plan; <br /> D. BBID Encroachment Permits. <br /> E. Condition shall be met prior to approval of the first Final Map. <br /> —7. Community Facility Fee: Prior to issuance of the first residential building permit,the <br /> developer shall comply with the most recent update of the Community Facilities Fee-(CFF) <br /> Plan as determined by the MHCSD. <br /> 8. Library: Prior to issuance of the 4,500'"residential building permit in the Mountain House <br /> Master Plan Area, begin construction of a library consistent with the requirements of the <br /> Master Plan and most recently adopted community facility plan and most recently adopted <br /> library plan. Completion shall be done within twelve months of commencement of <br /> construction, unless an extension is approved by the MHCSD General Manager. <br /> Alternatively, as determined by MHCSD, funding sufficient for the above described facility <br /> shall be provided to the MHCSD to provide library services in a manner determined by the <br /> MHCSD General Manager. <br /> 9. Corporation Yard Facilities: Construction shall begin prior to issuance of the 4,500'^ <br /> residential building permit in the Mountain House Master Plan area, unless the MHCSD <br /> General Manager determines that the facilities are not yet required. If the General Manager <br /> authorizes the facility to be deferred,the developer shall provide adequate bonding to the <br /> MHCSD assuring construction at the time the MHCSD General Manager determines the <br /> facilities to be required. Upon acceptance, the Facilities shall be dedicated to the MHCSD. <br /> This condition can be satisfied by an agreement acceptable to the MHCSD that the required <br /> facilities will be constructed on this schedule. <br /> 10. O & M Vehicles: Prior to the issuance of the first residential building permit developers will <br /> deposit in a MHCSD maintained Vehicle Capital Fund an amount equal to their prorate <br /> share(based on the CFF Plan Fee formula as determined by the MHCSD)of the total cost <br /> of O&M Vehicles as that cost is specified in the latest update of the CFF Plan Fees. <br /> 16 <br />