Laserfiche WebLink
N 0 <br /> W o <br /> A <br /> a College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> W Implementation&Verification <br /> g Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action Completed <br /> R begins during the nesting season(April 1–August <br /> 0 31),pre-construction surveys shall be conducted <br /> y during the nesting season in suitable nesting <br /> m habitat within 100 feet of areas of project <br /> C/' activity.The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> K Blackbird.If project construction begins during <br /> the nesting season(April 1–August 31),pre- <br /> 0 <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> K within 500 feet of areas of project activity.A <br /> o setback of 500 feet from California homed lark <br /> and tricolored blackbird nesting areas shall be <br /> a established and maintained during the nesting <br /> d <br /> o' season for the period encompassing nest building <br /> and continuing until fledglings leave nests.This <br /> CD <br /> 'g setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> v are known to be occupied.o m ted. Setbacks shall be P <br /> o marked by brightly colored temporary fencing. <br /> 3 4.10-9 Biological Resources—Conversion of San Joaquin Before construction SJCOG,in <br />