My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> iiv D <br /> a College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 2. Im <br /> 6 Mitigation Measure Timing/Schedule pImplementation&Verification <br /> lementation <br /> Responsibility Action ComCpleted <br /> n biologist and DFG determine it would not be <br /> likely to adversely affect the nesting pair.DFG <br /> shall also be consulted to determine if it is <br /> necessary to temporarily preserve foraging <br /> habitat(in addition to the buffer area)until the <br /> onest is no longer active. <br /> < If feasible,250400t buffer areas shall also be <br /> 3 established around all other occupied burrows.If <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer areas and/or <br /> relocation of owls is necessary.Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> alternative burrows outside the impact area,or <br /> capture and movement of owls to specific <br /> mitigation sites. <br /> u Other Nesting Raptors Before construction SJCOG,in <br /> CD <br /> < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> nesting season(February 15 to August 31),pre- conducted 2 weeks <br /> construction surveys shall be conducted by a prior to construction <br /> n; qualified biologist in areas of suitable nesting activities) <br /> o habitat within 500 feet of project activity. Surveys <br /> shall be conducted within 2 weeks before the <br /> m beginning of construction or tree removal.If no <br /> = active nests are found,no further mitigation shall <br /> co o be required. <br /> S < If active nests are found, impacts shall be avoided <br /> o` rn by establishment of appropriate buffers.No <br /> project activity shall commence within the buffer <br /> 5 area until a qualified biologist coniums that the <br /> nest is no longer active.DFG guidelines <br /> > > recommend implementation of 500-foot buffers, <br /> but the size of the buffer may be adjusted if a <br />
The URL can be used to link to this page
Your browser does not support the video tag.