My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G7 n <br /> N o <br /> CD <br /> m m College Park at Mountain House Specific Plan III <br /> W Mitigation Monitoring and Reporting Program <br /> m Implementation&Verification <br /> o Implementation <br /> 3 Mitigation Measure Timing/Schedule Date <br /> = o Responsibility Action <br /> Completed <br /> �• land uses,the operation of on-site landscape <br /> o maintenance equipment shall be limited to the <br /> c least noise-sensitive periods of the day,between <br /> the hours of 7:00 a.m. and 10:00 p.m <br /> CD 4.13-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> The project applicants shall implement the measures conjunction with the <br /> o identified below, developer <br /> < Before occupancy of the first residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> Grant Line Road between Central Parkway and <br /> the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the EIR)and the northern travel lane of <br /> Grant Line Road. The noise barriers may consist <br /> of a wall,berm, or combination thereof The <br /> exact location,height,and character of the noise <br /> barrier shall be determined by a noise consultant <br /> approved by the County.The sound barrier shall <br /> o reduce outdoor noise levels at the center of the <br /> front yards of the five existing residences to <br /> o below 65 dBA Ldn/CNEL.If Grant Line Road is <br /> o widened at this location subsequent to <br /> construction of the sound barrier but before <br /> removal of the five residences under Specific <br /> n Plan II,the sound barrier shall be relocated,as <br /> Cl) required.If the five existing residences are <br /> $ removed under Specific Plan 1I before occupancy <br /> of the first residence under the College Park <br /> project,this mitigation measure shall not require <br /> om implementation.This mitigation shall be funded <br /> > through fair-share payments by the College Park <br /> developers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.