Laserfiche WebLink
M <br /> o' College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Responsibility Action DateCompleted <br /> m n4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> Mountain House Parkway construction <br /> The following measures shall be implemented by the <br /> ? College Park developers: <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> 3 House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> "o vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> c west-facing pond berm shall be densely landscaped <br /> 0 by the College Park developers.In addition,the berm <br /> m shall be constructed by the College Park developers <br /> Wusing contoured and rounded slopes to avoid angular <br /> m face slopes.This shall be done concurrent with <br /> development of the pond. <br /> c <br /> av <br /> 2 <br /> d � <br /> � m <br /> o N <br /> a <br /> � n <br /> A -0 <br /> O y <br /> C � <br /> J <br /> `G - <br />