My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Issuance of building permits shall cease if construction does not begin when directed by <br /> the General Manager. <br /> B. The developer shall extend existing pipelines to the project site as shown on the Master <br /> Sanitary Sewer Plan. The developer shall also extend the sanitary sewer system <br /> pipelines to the Grant Line Village frontage road as directed by the General Manager in <br /> order to serve the residents of Grant Line Village. Interim treated wastewater land <br /> disposal capacity and piping system to serve the proposed project shall be provided by <br /> the developer until such time as the river discharges commence. Initiation of State <br /> Permit Application for land application of the treated discharge requirement shall parallel <br /> the treatment plant capacity condition noted above, as directed by the General Manager. <br /> C. The Wastewater Treatment Plant expansion requirement in Condition 26.A shall meet _ <br /> the requirements of the Regional Water Quality Control Board (RWQCB)effluent <br /> permits, including compliance scheduling, testing and any infrastructure that may be <br /> required for long-term discharge into Old River. Additional treatments that may be <br /> required by the RWQCB for such pollutants as dissolved solids, metals and heat, - <br /> etc., shall be addressed in the plant expansion. The developer shall bond for or fund <br /> construction for the developer's fair share cost prior to the filing of the first Final Map. <br /> 27. Water Treatment Plant: Under the direction of the MHCSD, the applicant shall fund, design <br /> and construct the last phased expansion of the water treatment plant(WTP)to provide the <br /> capacity required to serve Tract No.3481 prior to Issuance of the first building permit. <br /> Recognizing that there may be agreements between the developers for sharing capacity and <br /> also recognizing that the MHCSD is not a party to and has no control over such agreements, <br /> bonding for construction shall be provided prior to approval of the first final map and <br /> beginning of construction shall be at the discretion of the General Manager. Issuance of _ <br /> building permits shall cease if construction does not begin when directed by the General <br /> Manager. <br /> 28. Other Water System Facilities: Water storage requirements, booster pump station and <br /> looping of the water distribution system pipelines shall be done in accordance with the Water <br /> Master Plan and as directed by the MHCSD prior to issuance of the first building permit in <br /> SP III. Construction of one tank may be allowed if an engineering analysis shows that the _ <br /> second tank may be constructed at a later date without adverse impact on the first tank <br /> and/or existing customers of MHCSD. Each phase of SPIII will be reviewed to confirm the <br /> existing"in-place" infrastructure is adequate to provide MHCSD Design Standards. <br /> 29. Construction Emissions: The applicant shall implement the following: Regulation VIII <br /> Control Measures of the SJVAPCD and applicable measures in Table 6-3 of the SJVAPCD <br /> Guide for Assessing and Mitigating Air Quality Impacts. Timing: Note on improvement _ <br /> plans approved by the MHCSD for Tract 3481. <br /> 30. BBID Canal: The applicant shall reroute the canals as directed by BBID in order to ensure <br /> continued supply of agricultural irrigation water to lands remaining in agricultural use <br /> following construction. Timing: Approval of the rerouting and grading and improvement <br /> plans approved by MHCSD prior to approval of first Final Map. <br /> 31. Hold Harmless Provision: The subdivider shall defend, indemnify, and hold harmless the <br /> MHCSD, its agents, officers, and employees, from any claim, action, or proceeding against <br /> the MHCSD, its agents, officers, or employees, to attack, set aside, void, or annul an <br /> approval of MHCSD concerning any MHCSD condition, which action is brought within the <br /> time provided for in Section 66499.37 of the Government Code. <br /> 32. Landscanina and Architecture: <br /> A. The applicant shall clearly identify the landscaping and architectural theme to be used in <br /> Neighborhoods A/B for the school, Neighborhood Commercial areas, and other <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.