My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� m <br /> o <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule ResponsibilityAction Date <br /> Completed <br /> a4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> ;;a with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> °o Act Contracts disposal developer <br /> o� The project applicants shall implement the following <br /> co mitigation measure: <br /> 0 <br /> < At such time as the interim land disposal of <br /> o treated wastewater at the Pomba property is <br /> 3 discontinued,GNK, LLC shall remove the 30- <br /> 3 <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> a < Before development,the project developers shall developer, and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> CD <br /> irrigation canals shall be approved by BBID. <br /> M <br /> 4.6 CULTURAL RESOURCES <br /> m <br /> R- 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> o Resources developer, and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction, ground-disturbing activities at qualified <br /> = the construction site where the discovery was made archaeologist,if <br /> yshall be halted.The College Park developers or needed. <br /> tD construction contractor shall contact the San Joaquin <br /> Cn <br /> County Community Development Department <br /> a (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> C iv notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />
The URL can be used to link to this page
Your browser does not support the video tag.