Laserfiche WebLink
zz m <br /> 0 <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> Responsibility Action <br /> Completed <br /> aare capable of independent survival,the <br /> burrow can be destroyed. <br /> CD <br /> 0 4.10-6 Biological Resources—Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> o Active Nests <br /> < The College Park developers shall request <br /> w coverage under the SJMSCP,and fees shall be <br /> 3 paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> _ throughout much of the College Park site,but are <br /> concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields. During the SJMSCP application <br /> o process, SJCOG will determine whether that <br /> m <br /> specific project site supports suitable nesting <br /> -D habitat. If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> d SJMSCP incidental take avoidance and <br /> minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> iv measures below shall be implemented to avoid <br /> = loss of active nests of common raptor species, <br /> C/) which are not covered under the SJMSCP but are <br /> CD protected under the California Fish and Game <br /> mo Code.The project applicants shall retain <br /> ID qualified biologists to conduct all pre- <br /> 9 o construction surveys. <br /> o < White-tailed Kite.If project construction begins <br /> v <br /> > > during the nesting season(February 15– <br /> September 15),pre-construction surveys shall be <br /> I I I I I I I I I I I I I I I I I <br />