Laserfiche WebLink
�Z rn <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> K Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> Responsibility Action <br /> Completed <br /> n ► Before project activity,USFWS shall be consultation with <br /> A consulted to determine whether widening of USFWS <br /> oGrant Line Road has potential to adversely affect <br /> 3 Califnrnia red-legged frog. It may he necessary <br /> co to conduct a formal habitat assessment and <br /> _10 surveys to make such a determination. If it is <br /> determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> CD activities to certain seasons, minimizing <br /> m vegetation removal and in-water construction <br /> m activities,conducting pre-construction surveys, <br /> R" and conducting daily surveys and monitoring of <br /> d <br /> construction areas. If necessary,appropriate <br /> ocompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat. <br /> as <br /> CD Swainson's Hawk Before construction SJCOG,in <br /> 0 0 < If project construction begins during the (surveys shall be consultation with DFG <br /> cCDi Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> 9 0 DFG(March 1 to September 15),pre-construction prior to construction <br /> n -0 surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br /> I I I I I I I I I I I I I I f I <br />