Laserfiche WebLink
M <br /> D <br /> College Park at Mountain House Specific Plan HI <br /> 3 Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Acton <br /> Completed <br /> m <br /> n 4.134 Noise—compatibility of Proposed Land Uses After construction SJCCDD,in <br /> exceeding Predicted Noise Levels conjunction with the <br /> oThe College Park developers shall implement the developer;in <br /> follnwine measures: consultation with a <br /> co < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> 0 <br /> the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> 3 segments identified in Table 4.13-11 of the E1R, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> m below 65 dBA L&/CNEL and as close to 60 dBA <br /> m L&/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> d <br /> College Park developers. <br /> 0 <br /> c <br /> R <br /> U) c <br /> N N <br /> � f0 <br /> L Cn <br /> O p <br /> � (D <br /> C O. <br /> � n <br /> 0 <br /> O � <br /> C � <br /> `G = <br />