Laserfiche WebLink
IF 1 f f f f ► I f r r r f f r f If f <br /> W0 <br /> N 0 <br /> m CD College Park at Mountain House Specifle Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> plementation <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> = Completed <br /> O1 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> x Mountain House Parkway construction <br /> yThe following measures shall be implemented by the <br /> CD College Park developers: <br /> Cn <br /> < If the landscaping and edge treatments required <br /> CD <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or H at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition,the berm <br /> shall be constructed by the College Park developers <br /> ° using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> _ <br /> 0 <br /> _ <br /> m <br /> _ <br /> n <br /> m <br /> _ <br /> V <br /> 3 m <br /> � <br /> 0 <br />