Laserfiche WebLink
gm <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> m 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> n <br /> 713 Remains conjunction with the <br /> oIn accordance with the California Health and Safety developer, and in <br /> ? Code.. if bnman remains are uncovered during conjunction with <br /> construction at the project site, the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> n <br /> halt potentially damaging excavation and notify if needed. <br /> 3 SJCCDD.The County shall,in tum,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> a 7050.5[b]). If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> o determination(HSC Section 7050[c]). Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> m NAHC,the MLD,in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> 7X The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> im <br /> o remains are outlined in detail in the PRC Section <br /> 3 5097.9.Measures likely resulting from the above <br /> could include preservation in place and <br /> = capping/avoidance,or removal and continued <br /> Nmonitoring of ground-disturbing activities. <br /> D m <br /> o m 4.7 DRAINAGE <br /> ID <br /> 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD, in <br /> Capacity of the Storm-drain System conjunction with the <br /> o v The College Park developers shall expand WQBI as developer <br /> m <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br /> I I I I I I I I I I I I I I I I I <br />