Laserfiche WebLink
� m <br /> ^. o <br /> m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> �. Responsibility Action <br /> Completed <br /> nmaintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> o during construction that could be present in <br /> storinwatcr drainage and non-stormwater <br /> discharges; <br /> < Specify BMP inspection protocols to ensure that <br /> n <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> CD <br /> < Identify measures to prevent or clean up spills of <br /> CD hazardous materials used for equipment <br /> -v <br /> operation and hazardous waste; <br /> v < Identify emergency procedures for responding to <br /> K spills; <br /> < Identify BMPs that shall be used in all <br /> v_ subsequent site-development activities; <br /> X <br /> 2 < Identify personnel training requirements and <br /> N 0 procedures that will be used to ensure that <br /> CD workers are aware of permit requirements and <br /> 0 o proper installation and performance inspection <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> w supervisory duties related to implementation of <br /> the SWPPP; and <br /> < Require all construction contractors to retain a <br />