Laserfiche WebLink
i� m <br /> 0 <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure TiminglSchedule Date <br /> �. Responsibility Action <br /> Completed <br /> orequirements from the County Environmental <br /> Health Department. Dairy waste ponds or any <br /> -Oa other sources of contamination shall be removed <br /> 0 <br /> under a qualified hazardous materials expert in <br /> co accordance with applicable regulations and <br /> requirements from the Central Valley RWQCB or <br /> 0 <br /> the California Department of Toxic Substances. <br /> 3 This includes the December 4, 2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination,the regulatory agencies <br /> o shall be contacted, any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> CD (i.e.,septic systems,refuse piles, waste ponds, <br /> m electrical transformers containing PCBs)on the <br /> project site and off-site infrastructure sites shall be <br /> RL identified and removed under the supervision of <br /> d <br /> � qualified hazardous materials experts and in <br /> 0 accordance with applicable regulations before <br /> construction. The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> o the above has taken place before issuance of <br /> ,W„ building permits.If the experts observe potential <br /> CD <br /> soil contamination or noxious odors associated <br /> � U) <br /> CD with these facilities,the soils underlying these <br /> E. facilities shall be sampled and tested by the <br /> C-) -0 experts. If the testing reveals contamination,the <br /> regulatory agencies shall be contacted, any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br /> I I I f f I I I I I I I I I I I I <br />