My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r r F- F r r r r r r r r r r F r r r <br /> Cn0 <br /> N O <br /> 0 CD <br /> College Park at Mountain House Specific Plan HI <br /> W <br /> Mitigation Monitoring and Reporting Program <br /> S 5'L Implementation&Verification <br /> 0 a Implementation <br /> 0 Mitigation Measure Timing/Schedule Responsibility Action Date <br /> -ZCompleted <br /> shall be reviewed and approved by CDE,DTSC, <br />. = the SJCCDD,and the Lammersville School <br /> NDistrict.If these agencies determine,based on the <br /> PEA,that the school site does not meet CDE <br /> on <br /> siting requirements,the proposed school shall be <br /> CID <br /> developed at a different location within the <br /> College Park site,subject to clearance by a new <br /> W PEA to be funded by the developers.If the new <br /> school site is required,the developers shall be <br /> responsible for processing the required <br /> amendment to the College Park Specific Plan III <br /> and obtaining and dedicating the new school site <br /> 'w to the school district.The assessment and analysis <br /> would be conducted in accordance with CDE <br /> requirements and would be under separate CEQA <br /> documentation. <br /> 4.9-5 Public Health and Safety—Exposure to Pipeline During design phase SJCCDD,in <br /> K Hazards conjunction with the <br /> The following measures shall be implemented by the developer <br /> o College Park developers: <br /> < No habitable residential structures(i.e.,homes, <br /> K apartments,granny flats,garages converted to <br /> living quarters,patio rooms,sun rooms)shall be <br /> permitted within 68 feet of the PG&E–Chevron <br /> m pipeline that bisects the College Park site and <br /> n contains Pipelines L401,L002,and CSDF 0499. <br /> Alternatively,no habitable residential structures <br /> $ as defined above shall be permitted within 68 <br /> feet of the nearest pipeline in the PG&E <br /> easement.Outdoor structures such as pools, <br /> o m fences,patios,and decks could be allowed within <br /> q the no build zone,since occupancy would be less <br /> 3 * than 100%.Garages would be permitted as long <br />
The URL can be used to link to this page
Your browser does not support the video tag.