Laserfiche WebLink
r I r r r r- r r r r <br /> rn 0 <br /> vo <br /> w m College Park at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility action Date <br /> ¢ Completed <br /> for Protection of the San Joaquin Kit Fox before <br /> = or during Ground Disturbance(US Fish and <br /> y Wildlife Service[FWS] 19991b)shall apply <br /> CD (except that pre-construction survey protocols <br /> Cl) shall remain as established in the above <br /> CD <br /> paragraph).These standards include provisions for <br /> educating construction workers regarding the kit <br /> v fox,keeping heavy equipment operating at safe <br /> speeds,checking construction pipes for kit fox <br /> occupation during construction,and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources—Loss or Alteration of Before construction SJCOG,in <br /> w Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USACE and/or <br /> mitigated by participation in the SJMSCP.Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> o the College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> o including wetlands,shall be conducted by a <br /> o qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> m features that are potentially subject to United <br /> n States Army Corp of Engineers(USACE) <br /> jurisdiction(ponds,irrigation canals,and <br /> CD <br /> o drainages).The delineation shall be submitted to <br /> USACE for verification. <br /> < If,based on the verified delineation,it is <br /> 3 m determined that fill of waters of the United States <br /> d y would result from the Tentative Map or <br /> 3 development project,authorization for such fill <br />