My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> N. Landscaping and architectural design of all parcels designated as HOA or Landscape <br /> %V Maintenance District, shall be consistent with all Community Approvals including <br /> applicable provisions of the MHCSD Design Manual and MHCSD Standards. The <br /> design plans associated with each phase of the development shall be completed and <br /> `. approved by the MHCSD General Manager prior to the approval of the Final Map for <br /> that phase. <br /> `, O. Masonry walls shall be installed at the property line between residential properties and <br /> all public or private parcels. View Fencing or no fencing may be permitted in locations <br /> where residences face the Open Space as deemed appropriate by the MHCSD. Plans <br /> to be consistent with all Community Approvals including applicable provisions of the <br /> MHCSD Design Manual, MHCSD Standards, and any applicable Special Purpose Plan. <br /> �+ Timing: Improvement Plans approved by CDD and MHCSD prior to first building permit. <br /> Walls or fencing may be constructed at the same time as house fencing. <br /> `' P. All landscape pedestrian through-block connections shall be a minimum of 30 foot width. <br /> Larger width may be required in specific areas as deemed necessary by MHCSD. <br /> Timing: prior to approval of the First Final Map. <br /> Q. Pathways within pedestrian through-block connections or landscape corridor shall be a <br /> minimum of 8 foot width and shall be consistent with all Community Approvals including <br /> %1W applicable provisions of the MHCSD Design Manual and MHCSD Standards. <br /> �Aw R. Community Wall alignments along Grant Line Road and De Anza Boulevard, adjacent to <br /> %W residential properties, shall undulate and shall be consistent with all Community <br /> Approvals including applicable provisions of the MHCSD Design Manual and MHCSD <br /> Standards. Property lines shall follow the alignment of the Community Walls. A <br /> continual five-foot maintenance easement shall be provided on the residential lot side of <br /> the community wall and shall be recorded with the final map. Timing: prior to First Final <br /> Map. <br /> %W <br /> S. Indicate all Landscape Setback areas within Commercial and Industrial zones as <br /> `w required by the Master Plan. Timing: prior to approval of the First Final Map. <br /> V 33. A/B Neighborhood Parks: <br /> V <br /> A. The neighborhood parks identified within Specific Plan III shall be dedicated to MHCSD <br /> or an offer of dedication to the MHCSD shall be recorded with the First Final Map. <br /> %W Timing: condition shall be met with approval of First Final Map of Neighborhood A/B. <br /> ` B. The entire A/B Neighborhood Park shall be designed consistent with all Community <br /> Approvals including applicable provisions of the Parks, Recreation and Leisure Plan and <br /> `,, the MHCSD Design Manual. The design of the park shall be reviewed and approved by <br /> MHCSD. Timing: condition shall be met prior to approval of First Final Map. <br /> %W C. The MHCSD General Manager may allow the Neighborhood Park to be constructed in <br /> %W phases to be consistent with usage demand and other public interest considerations. <br /> Final design of the first phase of the Neighborhood Park shall be completed before its <br /> `. construction. Construction of the first phase of the neighborhood park shall begin no <br /> ,` later than the time at which 50%of the dwelling units for Neighborhood A/B(separate <br /> from Neighborhood D)or school attendance area, whichever is sooner, have been <br /> issued a building permit. The Park shall be completed no later than the time at which <br /> 80% of dwelling units for the neighborhood have been issued building permits. <br /> Completion time may be modified by the MHCSD General Manager to reflect <br /> construction, weather, budget, or other public interest contingencies. <br /> D. A formal agreement for joint use of parks and recreation facilities with adjacent K-8 <br /> schools shall be required prior to construction of the park. (Implementation Measure <br /> ty 7.2.2.3d) <br /> %W <br /> %W 26 <br /> `r <br />
The URL can be used to link to this page
Your browser does not support the video tag.