Laserfiche WebLink
D. Construction of Open Space Improvements may be completed on a phased basis to <br /> correspond with the development of neighborhoods, or parcels as determined by <br /> `r MHCSD directly adjacent to the facility. Open Space improvements to a specific <br /> segment shall be completed no later than the time at which 80% of dwelling units for the <br /> neighborhood, or adjacent parcels, have been issued building permits. Completion time <br /> may be modified by the MHCSD General Manager to reflect construction, weather, <br /> budget, or other public interest contingencies. <br /> E. Masonry Walls, consistent with the MHCSD Design Manual and MHCSD Standards, <br /> shall be constructed in all locations where residential properties abut Open Space <br /> Corridor areas. View Fencing or no fencing may be permitted in locations where <br /> residences face the Open Space Corridor as deemed appropriate by MHCSD. Timing: <br /> Improvement Plans approved by CDD and MHCSD prior to first residential building <br /> `. permit. <br /> b <br /> lbw`r <br /> V <br /> V <br /> V <br /> V <br /> rr <br /> kr. <br /> 14r <br /> IhAw <br /> *r <br /> V' <br /> `. <br /> yr <br /> ` 28 <br /> %W <br />