Laserfiche WebLink
( ( ( ( , ( ( ( ( ( ( f ( f 1 t ( I t ( ( e ( ( ( ( ( ( + ( t r kf Ur ( ( f <br /> d � <br /> o College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> c Ot Implementation <br /> Implementation&Verification <br /> 0 Mitigation Measure Timing/Schedule Responsibility Acton Date <br /> - Completed <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> ILand Uses construction,and Community <br /> cn The College Park developers shall implement the During design phase Development <br /> following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> r <br /> exposed to an explosion hazard from the natural <br /> � gas pipelines within the PG&E—Chevron <br /> 0 easement that bisects the project site. <br /> 3 <br /> < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> E any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> an <br /> m line. <br /> z <br /> m <br /> B <br /> v <br /> M <br /> v <br />