Laserfiche WebLink
K m <br /> O <br /> co D <br /> College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> K Implementation&Verificafion <br /> �. <br /> o Mit gat on Measure TiminglSchedule Implementation p Date Responsibility Action <br /> Completed <br /> arequirements from the County Environmental <br /> Health Department.Dairy waste ponds or any <br /> D other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> dci.urdauCC with a^ypiicabiC iCgnldi.�0ns and <br /> -° requirements from the Central Valley RWQCB or <br /> the California Department of Toxic Substances. <br /> 3 <br /> This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination,the regulatory agencies <br /> o shall be contacted,any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> (i.e.,septic systems,refuse piles,waste ponds, <br /> CD electrical transformers containing PCBs)on the <br /> m project site and off-site infrastructure sites shall be <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> oaccordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> 9s' the County Environmental Health Department that <br /> c the above has taken place before issuance of <br /> building permits. If the experts observe potential <br /> rn soil contamination or noxious odors associated <br /> awith these facilities,the soils underlying these <br /> �. facilities shall be sampled and tested by the <br /> n experts.If the testing reveals contamination,the <br /> regulatory agencies shall be contacted,any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br />