Laserfiche WebLink
K0 <br /> n' D <br /> 0 <br /> College Park at Mountain House Specific Plan HI <br /> = Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o Mitigation Measure Timing/ScheduleImplementation Date <br /> _. Responsibility Action <br /> Completed <br /> naction required"in the regulatory agency <br /> X databases,and the facilities that are the source of <br /> CD <br /> any contamination have been removed in <br /> accordance with applicable regulations.The <br /> project developers may attempt to advance the <br /> above,if they desire,by conducting their own <br /> investigations of these sites incoordination with <br /> 3 the property owners and regulatory agencies,and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation,or modification of <br /> structures on the project site and off-site <br /> N infrastructure sites constructed before 1981 <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey these buildings for asbestos and <br /> lead-based paint.Demolition,renovation, or <br /> Cl) modification of any structures identified as <br /> containing asbestos or lead-based paint shall be <br /> R performed by a licensed asbestos and lead-based <br /> paint abatement contractor in accordance with <br /> applicable regulations. <br /> 4.94 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards conjunction with the <br /> cn c < The College Park developers shall have a developer and a <br /> 8 preliminary Endangerment Assessment(PEA) qualified hazardous <br /> o` W prepared by a qualified hazardous materials materials expert;in <br /> $ , consultant for the school located near the Lucky J consultation with CDE <br /> Dairy,if required by California Department of and DTSC <br /> o Education(CDE).The PEA shall be prepared in <br /> °3' accordance with CDE and Department of Toxic <br /> Substances Control(DTSC)requirements and <br />