Laserfiche WebLink
� fr ( ( ( ( ( I ( fl ( r ( ( l ( ( ( ( ( ( ( ( ( ( ( ( f ( f ( ( ( f ( fF ( ( rf ( <br /> N n <br /> � o <br /> CD <br /> v College Park at Mountain House Specific Plan HI <br /> - Mitigation Monitoring and Reporting Program <br /> 0 o Implementation <br /> Implementation&Verification <br /> j Mitigation Measure Timing/Schedule Responsibility Action Date <br /> g Completed <br /> employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP.These include <br /> Nretention of tall vegetation,regular discing of the <br /> site,or use of chemicals or traps to kill ground <br /> -o squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> m <br /> activities would occur within 75 meters of <br /> = suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> s During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> o. representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> CD <br /> o by the permitting agencies,verifies through <br /> s <br /> noninvasive means that either(1)the birds <br /> n have not begun egg laying or(2)juveniles <br /> om from the occupied burrows are foraging <br /> E3 y independently and are capable of <br /> 3 independent survival.After the fledglings <br />