Laserfiche WebLink
� m <br /> o <br /> o' <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> �. Responsibility Action <br /> Completed <br /> n ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> oGrant Line Road has potential to adversely affect <br /> ? California red-legged frog.It may be necessary <br /> to CCnduct a o.^nal habitat assessment and <br /> surveys to make such a determination.If it is <br /> determined that adverse effects are unlikely to <br /> 3 occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and mimmie take to the <br /> greatest extent feasible shall be developed and <br /> on implemented.These may include limiting <br /> activities to certain seasons,minimizing <br /> 12 <br /> CD vegetation removal and in-water construction <br /> W activities, conducting pre-construction surveys, <br /> R and conducting daily surveys and monitoring of <br /> construction areas.If necessary, appropriate <br /> compensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> E' include measures such as enhancement of existing <br /> = habitat and creation of additional habitat. <br /> Cn0 <br /> CD Swainson's Hawk Before construction SJCOG,in <br /> o` o < If project construction begins during the (surveys shall be consultation with DFG <br /> Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> DFG(March 1 to September 15),pre-construction prior to construction <br /> o -a surveys shall be conducted in areas of suitable activities) <br /> > > nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br />