Laserfiche WebLink
Km <br /> r 0 <br /> D <br /> o' <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action <br /> Completed <br /> a ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> S uses shall coordinate with the SJVAPCD to <br /> ? assess situations in which toxic risk from diesel <br /> Par.t.icul.ate matter(FT,T..eoccur ny d to e :ems <br /> 0 <br /> methodologies that may become available to <br /> � estimate the risk. The developers shall implement <br /> 3 any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> rwv The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> ,RL The College Park developers shall implement all of construction developer <br /> a the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> d are already included in the proposed project design <br /> and/or are already required b the MRMP and b <br /> = Y 4 Y Y <br /> rn mitigation in the MIDAP and Delta College E1Rs. <br /> N <br /> CD <br /> J (p <br /> L Cn <br /> 0 -8M <br /> C_ <br /> 0 <br /> n <br /> 0 <br /> O y <br /> C <br />