Laserfiche WebLink
gm <br /> ^ 0 <br /> D <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> = Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> 6 Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action <br /> � Completed <br /> n 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> exceeding Predicted Noise Levels conjunction with the <br /> oThe College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> qualified acoustical <br /> ^ Tra �f,._ 1ais�Arl2:ials.n efc:e occupancy of, <br /> F <br /> 0 the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof.The exact location, <br /> W height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA Lm/CNEL and as close to 60 dBA <br /> m Ld./CNEL as feasible.This mitigation shall be <br /> m funded through fair-share payments by the <br /> College Park developers. <br /> m <br /> 0 <br /> 0 <br /> c <br /> _ <br /> N <br /> _ <br /> 2 <br /> d N <br /> _ W <br /> O U) <br /> d � <br /> c <br /> n � <br /> o iv <br /> c = <br /> _ <br /> -Z <br />