Laserfiche WebLink
MouNCA1N HousE PRoposim MAcRADo TENTATIVE MAP 4.ENvmtoNMENTAL CnEcKLisr -� <br /> 4.16 UTlLmRs AND SERyicE <br /> Less Than <br /> Potential SPIIIEIR Significant <br /> Significant Requires Impact Due New New <br /> Impact Additional to Mitigation Additional Additional <br /> Less Than Adequately Review:No Measures in Impact Not Mitigation <br /> Significant Addressed in Significant Project Addressed in Measures <br /> Issue or No Impact SPIIIEIR Impact Description SPIIIEIR Required ' <br /> 16. UTILITIES AND SERVICE <br /> SYSTEMS. Would the project: <br /> a) Exceed wastewater treatment ■ <br /> requirements of the applicable — — — - <br /> Regional Water Quality Control <br /> Board? <br /> b) Require or result in the construction ■ <br /> of new water or wastewater <br /> treatment facilities or expansion of <br /> existing facilities,the construction <br /> of which could cause significant <br /> environmental effects? <br /> c) Require or result in the construction ■ ❑ ❑ ❑ ❑ ❑ <br /> of new storm water drainage <br /> facilities or expansion of existing <br /> facilities,the construction of which <br /> could muse significant <br /> environmental effects? <br /> d) Have sufficient water supplies ■ Ll <br /> available to serve the project from <br /> existing entitlements and resources, <br /> or are new or expanded entitlements <br /> needed? <br /> e) Result in a determination by the ■ ❑ Ll <br /> 1.1 <br /> wastewater treatment provider <br /> which serves or may serve the <br /> Project that it has adequate capacity <br /> to serve the project's projected <br /> demand in addition to the provider's <br /> existing commitments? <br /> I) Be served by a landfill with ■ <br /> sufficient permitted capacity to Ll 11 <br /> accommodate the project's solid _ <br /> waste disposal needs? <br /> g) Comply with federal,state,and local ■ ❑ ❑ ❑ ❑ <br /> statutes and regulations related to <br /> solid waste? <br /> SETTING <br /> The Mountain House Community Services District(MHCSD)provides water supply, <br /> wastewater disposal,and storm drainage for the Mountain House Community of which the <br /> proposed project is a part. Infrastructure for these utilities has been provided in the <br /> neighborhoods currently under construction. Water supply includes a raw water supply - <br /> under contract with the Byron-Bethany Irrigation District,treatment,and distribution <br /> including booster pump stations,pipelines and storage tanks. The current capacity of the <br /> water treatment plant(W'IP) is five million gallons per day(mgd). Expansion of the plant to <br /> its ultimate capacity of 20mgd should begin shortly. Wastewater disposal includes collection <br /> 4-84 <br /> J <br />