Laserfiche WebLink
LAND USE <br /> 7. Fronting of Dwellings Adjacent to Linear Park. The following lots shall be developed so that <br /> dwellings constructed on said lots appear to front on the linear park(Lot T):9, 10,21,22,26, <br /> 31, 32,43, 50, 85, 86, 89, and 105. <br /> 8. Second Unit Dwellings: Second unit dwellings shall be required in accordance with the <br /> preliminary second unit plan approved with the Tentative Map. The minimum number of <br /> second unit dwellings required for Tract 3481 is 29. In no case shall second dwelling units be <br /> constructed on fewer than 10 percent of the lots within a subdivision [SPIII Implementation <br /> Measure 3.3.6.3(b)]. The Applicant shall place the following note on the applicable Final Maps <br /> for recordation: <br /> "Second unit dwellings shall be required on at least_lots consistent with the preliminary <br /> second unit plan approved with the tentative map and Chapter 9-830M of the San Joaquin <br /> County Development Title. The location of an approved second unit may be amended by <br /> Community Development Department only by-designation of a replacement lot to receive <br /> the second unit All replacement parcels must be located within Specific Plan III. Parcels <br /> for each residential subdivision shall be consistent with the preliminary second unit plan <br /> approved with the Tentative Map." <br /> Timing: Condition shall be met prior to recordation of each Final Map. <br /> 9. Agricultural Buffer: To the extent feasible,developers shall provide or secure a setback from <br /> development to existing agricultural operations of at least 100 feet. Occupancy permits shall <br /> not be issued for lots with less than a 40-foot setback from agricultural operations existing <br /> within a 12-month period prior to the time of final map approval. An exception to the <br /> requirement for a setback may be granted when the owner of such agricultural land has <br /> indicated in writing that the land will no longer be used for agricultural production. <br /> [Implementation Measure 3.2.4.3(d)] <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval. <br /> 10. Entry Landscape Areas: The Primary Community Entry at Mountain House Parkway and <br /> Grant Line Road,the Arterial Intersection Entries at Mountain House Parkway and R Drive and <br /> at De Anza Boulevard and Grant Line Road, and the Neighborhood Entries at Grant Line Road <br /> and Prosperity Street and C Street and at De Anza Boulevard and-J Drive shall.be-constructed <br /> in accordance with respective entry types Figure 4-20 of Specific Plan III and the MHCSD <br /> Design Standards. [Implementation Measure 4.2.4.3] <br /> Timing: Included with Improvement Plans and constructed concurrently with required road <br /> improvements. <br /> 11. Site Furnishings: Site furnishings shall be installed along all streets,trails,within parks,open <br /> space areas and entrances into communities in accordance with Implementation Measure <br /> 4.2.6.3. Such furnishings shall be included in all"Other Open Space areas"and within various <br /> homeowner mini parks and open areas. All furnishings are subject to design review approval. <br /> Timing: Reflect on Improvement Plans to be reviewed and approved by CDD and MHCSD and <br /> constructed prior to Final Map approval. <br /> 12. Exposure of New Residents to Odors: Dairy waste ponds and animal refuse piles located <br /> within the boundaries of the Tentative Map shall be removed. [MM 4.12-3] <br /> Timing: Prior to the approval of the first Final Map. <br /> 3 <br />