My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Km <br /> = o <br /> n' D <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Date <br /> Responsibility Action Completed <br /> n Kit Fox Habitat and Possible Occupied Den (surveys shall be consultation with DFG <br /> Destruction conducted 2 weeks to <br /> The College Park developers shall request coverage 30 days before <br /> under the SJMSCP, and fees shall be paid in the construction <br /> amount determined by San Joaquin County of activities) <br /> 0 <br /> Government(SJCOG)during the appli�aiiuu and <br /> a review process for each project under College Park. <br /> 3 Because the entire College Park site is located within <br /> the SJMSCP's Central/Southwest Transition Zone,the <br /> following SJMSCP incidental take avoidance and <br /> minimization measures shall be implemented for all <br /> projects: <br /> N < Pre-construction surveys shall be conducted 2 <br /> weeks to 30 days before commencement of <br /> ground disturbance.Surveys shall be conducted <br /> by a qualified biologist. If the surveys identify <br /> o potential dens(potential dens are defined as <br /> burrows at least 4 inches in diameter that open up <br /> CD within 2 feet),potential den entrances shall be <br /> dusted for 3 calendar days to register track of any <br /> San Joaquin kit fox present. If no San Joaquin kit <br /> fox activity is identified,potential dens may be <br /> c destroyed.If San Joaquin kit fox activity is <br /> d <br /> identified,then dens shall be monitored to <br /> determine if occupation is by an adult fox only or <br /> N c is a natal den(natal dens usually have multiple <br /> W m openings).If the den is occupied by an adult only, <br /> C/3 the den may be destroyed when the adult fox has <br /> moved or is temporarily absent.If the den is a <br /> �. natal den,a buffer zone of 250 feet shall be <br /> o maintained around the den until the biologist <br /> detemunes that the den has been vacated. <br /> < Where San Joaquin kit fox are identified,the <br /> provisions of the Standardized Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.