My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ko <br /> cn D <br /> 0 � College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation Implementation&Verification <br /> S Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> a ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> Grant Line Road has potential to adversely affect <br /> �. California red-legged frog. It may be necessary <br /> to conduct a formal habitat assessment and <br /> osurveys to makc such a deteftititiatiu". If it ih <br /> determined that adverse effects are unlikely to <br /> 3 occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted, and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> activities to certain seasons,minimizing <br /> vegetation removal and in-water construction <br /> activities,conducting pre-construction surveys, <br /> R and conducting daily surveys and monitoring of <br /> Kconstruction areas. If necessary,appropriate <br /> °c compensation for loss of habitat and other adverse <br /> R <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat. <br /> W c <br /> Swainson's Hawk Before construction SJCOG,in <br /> o` < If project construction begins during the (surveys shall be consultation with DFG <br /> c '9 Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> DFG(March 1 to September 15),pre-construction prior to construction <br /> o surveys shall be conducted in areas of suitable activities) <br /> > > nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br />
The URL can be used to link to this page
Your browser does not support the video tag.