My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pollution Control District and MHCSD prior to approval of Final Maps. <br /> 41. Pre-Construction Safeguards. Prior to any construction, appropriate plans, operating <br /> procedures and safeguards shall be undertaken to insure safety in the area of fuel lines and <br /> pipelines, consistent with the MHCSD Emergency Preparedness Plan (see Emergency <br /> Pipelines Safety Plan). <br /> BIOLOGICAL RESOURCES <br /> 42. Participation in SJMSCP: The developers of the Tentative Map shall request coverage <br /> under the San Joaquin Multi-Species Habitat Conservation and Open Space Plan (SJMSCP), <br /> and the project applicants shall pay the SJMSCP impact fees determined by the San Joaquin <br /> Council of Governments (SJCOG)during the application and review process for the project. <br /> A copy of the Certificate of Payment from SJCOG shall be provided to CDD as evidence of <br /> the payment of said fee. <br /> 43. Special-status plants: Before ground disturbance, pre-construction surveys for special-status <br /> plants shall be conducted by a qualified botanist in areas identified as suitable habitat by <br /> SJCOG at the appropriate time of year when the target species would be in flower or otherwise <br /> dearly identifiable. Surveys shall be conducted in accordance with specific methodologies <br /> described in Section 5.2.2.5 of the SJMSCP. <br /> If special-status plants are found, the following measures shall be implemented, depending <br /> on the species found: <br /> Sanford's arrowhead. Delta button-celery, and slouah thistle. The SJMSCP requires <br /> complete avoidance for these species;therefore, potential impacts on these species could <br /> not be covered through participation in the plan. If these species are present in the project <br /> area and cannot be avoided, a separate consultation with the appropriate regulatory agencies <br /> (likely DFG)would be required. This consultation shall determine appropriate mitigation <br /> measures for any populations affected by the project, such as creation of off-site populations <br /> through seed collection or transplanting, preserving and enhancing existing populations, or <br /> restoring or creating suitable habitat in sufficient quantities to compensate for the impact. All <br /> mitigation measures determined necessary during this consultation shall be implemented by <br /> the project proponents. <br /> Mason's lilaeopsis, rose mallow. Delta tule pea, and Delta mudwort. These species are <br /> considered widely distributed species by the SJMSCP, and dedication of conservation <br /> easements is the preferred option for mitigation. If these species are found in the project <br /> area, the possibility of establishing a conservation easement or in-lieu land dedication shall <br /> be evaluated. If neither establishment of a conservation easement nor in-lieu land dedication <br /> is feasible, no mitigation (in addition to payment of SJMSCP fees) shall be required. <br /> Bristly sedge and blue skullcap. These species are considered narrowly distributed by the <br /> SJMSCP, and dedication of conservation easements is the preferred option for mitigation. If <br /> these species are found in the project area, the possibility of establishing a conservation <br /> easement shall be evaluated. If dedication of a conservation easement is not a feasible <br /> option, the SJMSCP requires a consultation with the permitting agency representatives on <br /> the Technical Advisory Committee to determine the appropriate mitigation measures. These <br /> may include seed collection or other measures and would be determined on a population <br /> basis, taking into account the species type, relative health, and abundance. After the <br /> appropriate mitigation has been determined, it shall be implemented by the project <br /> proponents. [Mitigation Measure 4.10-2] <br /> 44. Conversion of burrowing owl habitat: If SJCOG determines suitable habitat is present on <br /> or adjacent to a given project site, the following SJMSCP incidental take avoidance and <br /> minimization measures shall be implemented: <br /> Burrowing owls shall be discouraged from entering or occupying construction areas by <br /> employing one of several methods outlined in Section 5.2.4.15 of the SJMSCP. These <br /> include retention of tall vegetation, regular discing of the site, or use of chemicals or traps to <br /> kill ground squirrels; <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.