Laserfiche WebLink
JUL 0 3 2006 <br /> ppAH!tl, <br /> r� APPLICATION REFERRAL <br /> PUBLIC HEARING <br /> FROM: SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> Development Services Division <br /> 1810 East Hazelton Avenue JUN 2 7 2006 <br /> Stockton, CA 95205 <br /> Phone: (209)468-3120 <br /> Contact Person: BILL FACTOR <br /> Phone: (209)468-3152 SU000- &/(b <br /> FAX: (209)468-3163 <br /> PE- Z(ot l <br /> The following project has been filed with this Department: <br /> APPLICATION NUMBER: PA-0500544(Major Subdivision) <br /> PROPERTY OWNERS: Golden State Investments LP <br /> APPLICANT: Golden State Investments LP <br /> PROJECT DESCRIPTION: The applicant, Golden State Investments LP, is seeking the approval of a Major <br /> Subdivision Application ('Tentative Map"or"project')that would create 286 residential lots from a parcel 35 <br /> acres in size, plus mini parks, paseos and other open space areas . Of the 286 residential lots, 154 would <br /> be zoned R-M (Residential, Medium Density)and 132 would be zoned R-MH (Residential, Medium-High <br /> Density). Buildout of the project would result in a density of development for the R-M area of 7.2 dwelling <br /> units per gross acre and a density of development for the R-MH area of 12.8 dwelling units per acre. Overall <br /> residential density would be 8.9 dwelling units per acre. Four housing products are planned:Alley Load (76), <br /> Garden Court(75),Attached Townhouse (80), and Standard Single Family Detached (55).Alley Load <br /> homes would range in size from 1,396 to 2,643 square feet;Garden Court homes would range in size from <br /> 1,389 to 2,078 square feet; and Standard Single Family Detached homes would range in size from 1,593 to <br /> 2,722 square feet.Although the sizes of Townhouse homes are not known at this time, a typical Townhouse <br /> lot would be 1,694 square feet. Not including Townhouse homes,there would be a total of 49 dwelling units <br /> that would be 1,400 square feet or less in size. In addition to these smaller dwelling units, 16 second unit <br /> dwellings would be constructed. <br /> Primary access to the project would be provided from Central Parkway, which abuts the project on the <br /> south, and from De Anza Boulevard,which abuts the project on the east. A soundwall would be constructed <br /> along the eastern boundary of the project on the west side of De Anza Boulevard. A West Side Irrigation <br /> District pipeline and 40-foot-wide easement that currently extends along the western and northern <br /> boundaries of the project would be relocated south of the project site along Central Parkway. <br /> PROJECT LOCATION: The project is located at the northwest corner of Central Parkway and De Anza <br /> Boulevard, which are yet to be constructed, in Mountain House. (Supervisorial District 5) . <br /> ENVIRONMENTAL DISCUSSION: An Environmental Checklist("Checklist')has been prepared for the <br /> project.The Checklist concluded that: 1)the project is a subsequent activity that is within the scope of the <br /> Specific Plan III EIR(SPIIIEIR); 2)there are no effects of the project that were not examined in the SPIIIEIR; <br /> 3)and no new mitigation is required for the project. Consequently, as provided by CEQA Guidelines Section <br /> 15168 (c), no new environmental document is required. The Checklist and the SPIIIEIR are available for <br /> review at the San Joaquin County Community Development Department, 1810 E. Hazelton Avenue, <br /> Stockton, CA. <br /> APPLICATION REVIEW: If you have any recommendations or comments on this project, please submit <br /> them to the Community Development Department no later than July 19, 2006. Comments or <br />