Laserfiche WebLink
k` ■ KLEINFELDER <br /> A-2.7 Soil Boring Closure and Soil Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. Closure is <br /> '! accomplished by grouting the boring with a cement/bentonite slurry or as otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums or wrapped in plastic and left on site for disposal <br /> ` by the site owner. If requested, Kleinfelder can coordinate disposal of soil and water with <br /> contractors after chemical analysis results are available. <br /> A-3 GROUNDWATER MONITORING <br /> A-3.1 Monitoring Well Construction <br /> Construction details for shallow ground water monitoring wells are as follows: <br /> • The well casing will be 2-inch inside diameter, flush threaded joint, schedule 40 PVC pipe. <br /> • The wells will be constructed in 8-inch diameter boreholes. <br /> • Well screen sections are perforated with 0.010- or .020-inch factory-cut slots. This <br /> parameter is assessed (and modified if required) after the boring logs and, if warranted, a <br /> sieve test has been performed and the results received. <br /> • The wells are generally screened from 5 feet above to 20 feet below first groundwater. The <br /> screen length is reduced if an aquitard with a minimum thickness of 5 feet is encountered. If <br /> ` an aquitard is encountered the well is usually terminated 1 to 2 feet into the aquitard. Effort <br /> is made not to screen across two aquifers. If confined aquifer conditions or high vadose zone <br /> contamination is encountered, the well screen is usually not set above the depth of first <br /> encountered ground water. Wells are usually not set in areas of suspected significant soil <br /> contamination. <br /> .. • The PVC pipe and end caps are steam-cleaned prior to installation. <br /> • The annular space between the screen and the wall of the boring is backfilled with the <br /> appropriate clean Lone Star Industries 0/30 or 2/12 Monterey sand to approximately 2 feet <br /> above the top of the perforated sections. Based on soil logs or a sieve test, modifications <br /> may be made regarding the size of sand to be used. Installation of the 0/30 sand may require <br /> that the sand be tremmied, using clean water. In this event, a sample of the tremie water is <br /> collected, unless the source is known to be clean. <br /> • A 3- to 5-foot bentonite plug is placed above the sand pack to provide a seal against surface <br /> water infiltration. <br /> r. <br /> 21073/ST03R1067 Page A-3 <br /> O 2003 Kleinfelder,Inc. July 28,2003 <br /> r <br />