Laserfiche WebLink
1, ✓ <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-02-393 <br /> 2. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $532.00 per <br /> 1,000 gross square foot of building designated as Warehouse or $109.06 per additional <br /> daily trip-end generated in the Mountain House area. The fee shall be automatically <br /> adjusted July I of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:ar <br /> P�OM NTS\SA\Yr 2WZTA-02-393..yd <br />