Laserfiche WebLink
>Rp.1w O <br /> L <br /> 5 � THOMAS M. GAU UP P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> ••. < DIRECTOR ���� ,y STOCKTON,CALIFORNIA 95201 <br /> r. � � (209)468-3000 FAX(209 468-2999 <br /> {lr F'GPY,P• 1 www.sjgov.org/pubworks <br /> FRITZ BUCHMAN * <br /> DEPUTY DIRECTOR ,Y. <br /> MICHAEL SELLING Warldng for YOU RECEIVED <br /> DEPUTY DIRECTOR <br /> JIM STONE <br /> DEPUTY DIRECTOR MAY - 7 2013 <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR San Joaquin County <br /> Community Development <br /> May 3,2013 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: John L. Funderburg <br /> FROM: Alex Chetley,Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-0900124; REVISION;A Minor Subdivision application to subdivide an existing 41.19-acre <br /> parcel into three(3)parcels. Parcel 1 to contain 32.97 acres,Parcel 2 to be a 5-acre home-site <br /> parcel and Parcel 3 to be a 3.69-acre financing parcel; located on the west side of Jack Tone <br /> Road approximately one-half mile south of Live Oak Road,northeast of Stockton. (Supervisorial <br /> District 4) <br /> PROPERTY OWNER: Jacqueline J. Polk Trust APPLICANT: A.R. Sanguinetti&Associates <br /> ADDRESS: 10549 N.Jack Tone Road APN: 063-210-23 <br /> INFORMATION: <br /> A portion of the site within Mosher Creek is currently located within a Federal Flood Insurance Administration <br /> Designated Flood Hazard Area Designated as Zone A with no flood elevations determined. <br /> Jack Tone Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br />