Laserfiche WebLink
TO Squill_Cp <br /> COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> • '` DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> • �i�1Fop:h�• STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRE=R <br /> November 21, 2000 DECEIVED <br /> MEMORANDUM NOV 22000 <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department Community Development Dept. <br /> CONTACT PERSON: Tina Wehrmeister <br /> - htfL�l-�? <br /> FROM: f` V- Gabriel Kardmg�'r,, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-00-63 A SITE APPROVAL APPLICATION TO CONVERT AN EXISTING <br /> THE EAST SIDE NOF JEACK TONE ROAD AND SOUTHEAALL AGRICULTURAL ST LOCATED ON <br /> SIDE O <br /> FRENCH CAMP ROAD. (DISTRICT 5). <br /> APPLICANT: Van Groningen and Sons, Inc. APN: 203-060-13 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Jack Tone Road has an existing right-of-way width of 80 feet and a planned right-of-way <br /> width of 84 feet. Louise Avenue has an existing right-of-way width of 40 feet and a planned <br /> right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $170.83 per <br /> daily trip-end generated in the Manteca area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 23, 1990. <br /> (Resolution R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-0K103-MID <br /> E: Thomas M. Gau, Deputy Director/Development <br />