Laserfiche WebLink
COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> a ?j DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> R O.BOX 1810- 1810 EAST HAZELTON AVENUE R �MANUEL DIRECTORLOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 �/` D._EPuiv INKLE <br /> • �.... ;P 209/468-3000 1,�}tak5bNIEINKLER <br /> '46%koRN FAX:209/468-2999 FEB 1 iaEcioa <br /> HENRY M. HIRATA l 1 24D0 <br /> DIRECTOR Co�n,nun/a!Y D <br /> February 10, 2000 BV@t�p�BntDept <br /> M E M O R A N D U M <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer r'k <br /> Public Services Division <br /> SUBJECT: SA-99-105 A SITE APPROVAL APPLICATION FOR A CELLULAR <br /> COMMUNICATIONS FACILITY TO INCLUDE A 100-FOOT HIGH <br /> STEEL MONOPOLE TOWER AND A 9-FOOT BY 12 . 6-FOOT <br /> EQUIPMENT SHELTER, LOCATED ON THE NORTHEAST CORNER OF <br /> STATE HIGHWAY ROUTE 26 AND JACK TONE ROAD. <br /> (DISTRICT 4) . <br /> APPLICANT: Frank and P. Giannecchini, et al . APN: 091-050-26 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Jack Tone Road has an existing right-of-way width of 80 feet and a <br /> planned right-of-way width of 84 feet . <br /> RECOMMENDATIONS : <br /> 1 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Sections 9-1145 .4 and 9-1145 . 5) <br /> 2 . The driveway approach shall be improved in accordance with <br /> the requirements of San Joaquin County Standards R-17 prior <br /> to issuance of the occupancy permit . <br /> (Development Title Section 9-1145 . 5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of <br /> building permit application. (The fee currently is $582 per <br /> 1, 000 gross square foot of building as Manufacturing <br /> generated in the Linden area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, <br /> R-95-650 and R-96-592) <br /> 4 . A copy of the Final Site Plan shall be submitted prior to <br /> release of building permit . <br /> GK:RH:af <br /> PS-OSO42-AlD <br /> E: Manuel Lopez, Deputy Director/Development <br />