Laserfiche WebLink
r February 25, 2002 <br /> Job Number:LG01-397 <br /> Page 2 <br /> July,numerous"pump-outs"were required to prevent overflow of the system. There are no <br /> known problems with the west septic system. <br /> r A percolation test was performed to evaluate an area that could potentially be used for a <br /> new large septic system. The new system could potentially lessen or eliminate the load on the <br /> eastern septic system. <br /> Il. PROPOSED DEVELOPMENT <br /> r <br /> The site is presently a cherry production facility consisting of an icehouse, office space, <br /> and warehouse space. Two septic systems and one water well presently serve the needs of the <br /> r facility. Chinchiolo Fruit Company, Inc. is building a new 50,000 s.f. metal building located in <br /> the northeast comer of the property. <br /> Broadway Investments is in the process of purchasing orchard property located directly <br /> north of the existing facility through a lot line adjustment. A portion of this area could be used <br /> L for a new septic system which could accept the peak seasonal loads and serve the needs of a new <br /> 50,000 s.f.metal building. <br /> i_ III. PRESENT AND PAST USE OF THE SITE <br /> An interview with Mr. Robert Chinchiolo was conducted to learn about the site history. <br /> Mr. Chinchiolo indicated the property previous to 1994 was an apple orchard. The property at <br /> that time was owned by Henry Foppiano who owned the land for an unknown period of time <br /> prior to the sale to Broadway Investments. The cherry packing facility was built north of the <br /> r existing Sierra Hills Packing facility after 1994. <br /> The Chinchiolo Fruit Company processes cherry fruit. The busy season is roughly a 10- <br /> week period between May and July. During this period, 200 to 600 temporary employees work <br /> on site for three(3) shifts, seven(7) days a week. Last year, the east septic system,located along <br /> Jack Tone Road,was pumped out frequently due to its inability to dispose of waste water. <br /> During the rest of the year, the septic system serves the exiting office building with 12 <br /> employees adequately. <br /> Waste water from the cherry processing line and the apple production line, located on the <br /> neighboring Sierra Hills Packing property,is disposed into a pond located on the west portion of <br /> the site(Plate 1). The California Regional Water Quality Control Board provided Chinchiolo <br /> Fruit Company and Sierra Hills Packing with monitoring requirements which include testing for <br /> r <br /> OF[SOL <br /> 4 <br /> ♦n <br /> O <br /> r �SSOC\ <br /> r, <br />