My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004224
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
500
>
2600 - Land Use Program
>
PA-0300440
>
SU0004224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:34 AM
Creation date
9/6/2019 10:26:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004224
PE
2632
FACILITY_NAME
PA-0300440
STREET_NUMBER
500
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
LINDEN
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
500 N JACK TONE RD
RECEIVED_DATE
8/29/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\500\PA-0300440\SU0004224\APPL.PDF \MIGRATIONS\J\JACK TONE\500\PA-0300440\SU0004224\CDD OK.PDF \MIGRATIONS\J\JACK TONE\500\PA-0300440\SU0004224\EH COND.PDF \MIGRATIONS\J\JACK TONE\500\PA-0300440\SU0004224\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br />COMMUNITY DEVELOPMENT <br />PA -03-440 (SA) <br />RECOMMENDATIONS: --. <br />An encroachment permit shall be required for work within road right-of-way. <br />(Development Title Sections 9-1145.4 and 9-1145.5) <br />2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br />County Standards R-17 prior to issuance of the occupancy permit. <br />(Development Title Section 9-1145.5) <br />The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br />payable at the time of building permit application. (The fee currently is $3802.00 per 1,000 gross <br />square foot of building designated as Retail Service in the Linden area. The fee shall be <br />automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br />published by the Engineering News Record.) (Resolutions 00-433) <br />4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The <br />fee is due and payable prior to issuance of the building permit. (The fee currently is $528.00 per <br />1,000 gross square foot of building designated as Retail Service. The fee shall be automatically <br />increased on January I of each year through the year 2005 at the rate of 7.66 percent.) <br />(Development Title Section 9-818.4.and Resolutions R-91-327, R-94-185 and R-97-5) <br />A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br />met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br />required upon submittal of verification. <br />NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br />require a State NPDES construction permit. <br />DTP:DG:ar <br />PACOMMPNTSISAWR 20031PA-0300440.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.