Laserfiche WebLink
a <br /> Ms. Natef U tJ Page 4 of 4 <br /> PA-0700080(SA) <br /> Curtail construction during periods of high ambient pollutant concentrations; this may <br /> include ceasing of construction activity during the peak-hour of vehicular traffic on <br /> adjacent roadways, and "Spare the Air Days" declared by the District. <br /> Implement activity management (e.g. rescheduling activities to reduce short-term <br /> impacts) <br /> During the smog season (May through October), lengthen the construction period to <br />` minimize the number of vehicles and equipment operating at the same time. <br /> Off road trucks should be equipped with on-road engines when possible. <br /> Minimize obstruction of traffic on adjacent roadways. <br /> District staff is available to meet with you and/or the applicant to further discuss the <br /> regulatory requirements that are associated with this project. if you have any questions <br /> call Jon Klassen at 559 230-5843 and provide <br /> or require further information, please { ) <br /> the reference number at the top of this letter. <br /> Sincerely, <br /> David Warner <br /> Director of Permits Services <br /> Arnaud Marjollet <br /> ° Permit Services Manager <br /> DW: jk <br /> cc: File <br />