Laserfiche WebLink
Produce Packing SA-01-64�n - 2 - ! 12 September f p 2001 <br /> No. CAS000002 for Discharges of Storm Water Associated With Construction Activity. Before <br /> k construction begins, the proponent must submit an NOI to comply with the permit to the State Water <br /> Resources Control Board and a SWPPP must be prepared. If there are any questions about this process <br /> or the storm water program, you may call Phillip Isorena at (916) 255-3398. Additional information can <br /> be found at the Storm Water website-http://www.swrcb.ca.gov/stormwtr/index.html. ' <br /> If the project will involve the discharge of dredged or fill material into navigable waters or wetlands, a <br /> permit pursuant to Section 404 of the Clean Water Act may be needed from the US Army Corps of <br /> Engineers. If a Section 404 permit is required by the Corps, the Board will review the permit application <br /> to ensure that discharge will not,violate water quality standards. For more information, contact the <br /> E Sacramento District of the Corps of Engineers at (916) 557-5250 or Matthew Reischman with the <br /> Regional Board at (916) 255-3120. <br /> If you have,any questions about the RWD'process,please telephone me at (916)255-3116. <br /> TIMOTHY R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> Lower Sacramento River Watershed <br /> cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> i <br /> C%Projcca I'&v.Si10SATisc.Cai'Fis1:•i+] G3tiiLdoc <br />