My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004638 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
8372
>
2600 - Land Use Program
>
PA-0400519
>
SU0004638 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:01 AM
Creation date
9/6/2019 10:27:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004638
PE
2631
FACILITY_NAME
PA-0400519
STREET_NUMBER
8372
Direction
S
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
APN
18308005
ENTERED_DATE
9/29/2004 12:00:00 AM
SITE_LOCATION
8372 S JACK TONE RD
RECEIVED_DATE
9/21/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\8372\PA-0400519\SU0004638\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L u <br /> LMarch 25,2005 <br /> NOA Project Number: E05005A <br /> Lin the ground water above 2.8 mg/L-N over the long term. <br /> 4.2 Methods of Mitigation <br /> LBecause of the favorable result of the nitrate loading calculation, no mi ad don,measurq.= <br /> warranted. Due to unsatisfactory percolation rates in the septic disposal al rea, an engineered septic <br /> { system will be provided to mitigate the poor soil condidtions <br /> L5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Our office concludes that the proposed project will not cause a build up of nitrates above 2.8 <br /> 4 mg/L-N in the ground water.We recommend the EHD guidelines be followed for the construction <br /> L• of the septic system. <br /> L5.1 Signatures <br /> The signatures of the environmental professionals involved in the preparation of this report can be <br /> found on the cover sheet at the front of this package. <br /> 5.2 Attachments <br /> LAll required attachments and appendices can be found at the rear of this package. <br /> 6.0 LIMITATIONS <br /> L <br /> Our professional services were performed, our findings obtained, and our conclusions proposed in <br /> accordance with generally accepted engineering principles and practices. This warranty is in lieu of <br /> all other warranties either expressed or implied. Test findings and statements of professional <br /> opinion do not constitute a guarantee or warranty, expressed or implied. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.