Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1100024 <br /> Sutter Home Winery, Inc. <br /> Use Permit Application No. PA-1100024 was approved by the San Joaquin County Planning <br /> Commission on June 19, 2014. The effective date of approval is June 29, 2014. This approval will <br /> expire on June 17, 2027, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been secured and remain in force, and (3) all necessary permits <br /> from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Stephanie Stowers, [209]468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit application. A fee <br /> is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing winery to be completed in two <br /> phases over fifteen years, as shown on the revised Site Plan dated April 28, 2014. Phase 1, building <br /> permits to be issued within eighteen months from the effective date of approval, includes a 300,000 <br /> square foot bottling building, a 38,750 square foot press building, a 16,000 square foot bottling tanks <br /> building, a 600,000 square foot warehouse, a 5,000 square foot administration building and a 3,000 <br /> square foot administration building, two tank areas that total 253,525 square feet, and a 104,092 <br /> square foot parking lot. Phase 2, building permits to be issued within fifteen years from the effective <br /> date of approval, is for the construction of a 300,000 square foot bottling building, a 600,000 square <br /> foot warehouse, and two tank areas that total 683,800 square feet. Phase 2 also includes the <br /> addition of an electrical switching station as an accessory use to the winery. The project will not have <br /> a tasting room or marketing events and will not be open to the public. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9- <br /> 1015.5[e]) <br /> (2) A minimum of 488 automobile parking spaces shall be provided, including nine accessible <br /> spaces, two of which shall be van accessible. Accessible spaces shall be located as close as <br />