Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO.R5-2002-0034 -2- <br /> SUTTER <br /> 2SLITTER HOME WINERY <br /> LODI FACILITY, SAN JOAQUIN COUNTY <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequency <br /> Freeboard 0.1 Feet Measurement Weekly Monthly <br /> pH pH units Grab Twice-Weekly Monthly <br /> ;Dissolved Oxygens mg/1- Grab ry... «leekly ., ,.:.. r;,„;. .Monthly <br /> Total Dissolved Solids mg/1 Grab Monthly Monthly <br /> Total Sulfate mg/I Grab Monthly Monthly <br /> Nitrates as Nitrogen mg/1 Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen mg/1 Grab Monthly Monthly. <br /> BOD,' mg/l Grab Monthly Monthly <br /> ' The dissolved oxygen readings must be collected between 7:00 a.m. and 09:00 a.m. <br /> 2 Five-day,206 Celsius Biochemical Oxygen Demand. <br /> STORMWATER POND MONITORING <br /> The stormwater pond shall be monitored whenever there is water in it. Samples shall be collected from <br /> an established sampling station located in an area that will provide representative samples. Monitoring <br /> of the pond shall include, at a minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequent <br /> pH pH units Grab Weekly Monthly <br /> Electrical Conductivity µmhos/cm Grab Weekly Monthly <br /> Total Dissolved Solids mg/l Grab Monthly Monthly <br /> Nitrates as Nitrogen mg/1 Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen mg/1 Grab Monthly Monthly <br /> BODS' mg/1 Grab Monthly Monthly <br /> LAND APPLICATION AREA MONITORING <br /> The Discharger shall conduct monitoring of wastewater discharged to the land application area. <br /> Monitoring of the land application area shall be conducted daily during operation and the results shall <br /> be included in the monthly monitoring report. Evidence of erosion, field saturation, runoff, or the <br /> presence of nuisance conditions shall be noted in the report. Wastewater shall also be monitored to <br /> ascertain loading rates at the land application area. Monitoring of the effluent and the land application <br /> area shall include, at a minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency FrequencX <br /> Flow from Pond No. 2 gallons Continuous) Daily Monthly <br /> Acreage Applied2 acres Calculated Daily Monthly <br /> -Application Rate gal/acre/day Calculated Daily Monthly <br /> Total Nitrogen Loading Rate3 lbs/acre/month Calculated Monthly Monthly <br /> Total Dissolved Solids lbs/acre/month Calculated Monthly Monthly <br /> Loading Rate <br />