Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. I 1 <br /> SUTTER HOME WINERY <br /> LODI FACILITY, SAN JOAQUIN COUNTY <br /> 6. Public contact with wastewater shall be precluded through such means as fences, signs, and other <br /> acceptable alternatives. <br /> 7. The land application area shall be managed to prevent breeding of mosquitoes. More specifically: <br /> a. All applied irrigation water must infiltrate completely within 24 hours. <br /> b. Ditches not serving as wildlife habitat should be maintained free of emerbent, marginal, and <br /> floating vegetation. <br /> c. Low pressure pipelines, unpressurized pipelines, and ditches that,are accessible to mosquitoes <br /> shall not be used to store wastewater water. <br /> S. Discharges to the land application area shall be managed to minimize both erosion and runoff <br /> from the land application area. <br /> 9. The Discharger may not discharge effluent to the land application area 24 hours before <br /> precipitation, during periods of precipitation, and for at least 24 hours after cessation of <br /> precipitation, or when soils are saturated. <br /> 10. Application of process.wastewater to the land application area via flood irrigation shall only occur <br /> minimize ponding and provide for <br /> on furrows graded so as to achieve uniform distribution, mi p g p <br /> tailwater control. Furrow runs shall be no longer and slopes shall be no greater than what permits <br />' reasonably uniform infiltration and maximum practical irrigation efficiency. The minimum <br /> furrow slope shall not be less than 0.2%. <br /> 11. Wastewater application areas (e.g. furrows) shall be allowed to dry for at least 72 hours from the <br /> end of wastewater application. <br /> i 12. Application of wastewater to the land application area shall be performed in accordance with the <br />' Operation and Maintenance Plans and Cropping Plan submitted with the 15 November 2001 <br /> F RWD. <br /> 13. There shall be no standing water in the land application area 24-hours after wastewater is applied, <br /> except during periods of heavy rains sustained over two or more consecutive days. <br /> 14. The wastewater discharge shall not occur within a 50-foot wide buffer zone along any property <br /> lines adjacent to properties developed with residences. <br /> 15. The resulting effect of the wastewater discharge on the soil pH shall not exceed the buffering <br /> F <br /> capacity of the soil profile. <br /> E. Solids/Sludge Disposal Requirement: s <br /> 1. Collected screenings, sludge, and other solids removed from winery wastewater shall be disposed <br /> of in a manner that is consistent with Title 27, Division 2, Subdivision 1 of the CCR and <br /> approved by the Executive Officer. <br /> CAProje t FiWSiteslSetter 14=6Suttffflc aWDR-3'.doe <br />