My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002249
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2600 - Land Use Program
>
UP-98-08
>
SU0002249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:08 AM
Creation date
9/6/2019 10:28:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002249
PE
2626
FACILITY_NAME
UP-98-08
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
APN
01115012
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\APPL.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\CDD OK.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\EH COND.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPTIC TANK & LEACH FIELD PROJECT Revised 05/19/2010 <br /> SUTTER HOME WINERY <br /> Westside Facility, Lodi CA <br /> a. Filter fabric: Non-woven material, with weight of 0.35 oz./s.y. to <br /> 1.0 oz./s.y., apparent opening size of (AOS) of 20-30 U.S. Sieve <br /> (ASTM D 4571) and manufactured by Carriff Corp. Soil Separator, <br /> Reemay Spunbond Tileguard or Typar. <br /> b. Sand bedding: clean washed sand, approved by Don Chesney prior <br /> to installation <br /> 6. Piping and Appurtenances: <br /> a. Leach field transport lines, manifolds and laterals: PVC schedule <br /> 40 with solvent weld fittings, ASTM D 1784 and D 1785 <br /> b. Pump discharge piping and force mains: PVC schedule 40 with <br /> solvent weld fittings, ASTM D 1784 and D 1785 <br /> c. Gravity sewer piping: PVC SDR 35, ASTM D-3034 with gasketted <br /> joints and solvent weld fittings. <br /> d. Check valves at leach field: 1.5" size, Orenco KSC 1500-S <br /> e. Check valves at pump discharges: Danfoss Flomatic Model 208S <br /> ball check valve with PVC body, socket weld ends and Buna-N ball. <br /> f. Flushing assembly at leach field: 1" size, Orenco SEK 100V <br /> g. Vent pipe for tanks: 3" Sch. 40 aluminum pipe and fittings, NPT or <br /> welded. Provide stainless steel screen on end of vent (1/8" mesh) <br /> 7. Electrical conduit: <br /> a. Underground: Schedule 40 PVC <br /> b. Aboveground: Schedule 40 aluminum, wrapped with 10 mil tape <br /> where in contact with the ground. <br /> 8. Electrical junction boxes: traffic rated precast concrete, size as required. <br /> 9. Septic tanks: shall be a single-wall fiberglass reinforced plastic (FRP) <br /> Underwriters Laboratories-labeled, IAPMO approved, H2O traffic rated, <br /> underground storage tanks as shown on the drawings. The tank size, <br /> fittings and accessories shall be as shown on the drawings. Interior <br /> appurtenances shall all be provided and installed by the tank <br /> manufacturer (excluding pump, float switch support and pump <br /> discharge piping). Effluent filters shall be provided by the Contractor <br /> and installed in the factory by the tank manufacturer. No connections to <br /> the tank shall be made in the field except for piping connections to inlet <br /> and outlet piping and piping connections through risers. Risers shall.be <br /> provided by the tank manufacturer and installed in the field. The <br /> fiberglass tank shall be manufactured by Xerxes Corporation. Alternate <br /> manufacturer: Containment Solutions, Inc. <br /> a. Anti-flotation: manufacturer shall determine the need for anti- <br /> flotation devices based upon the information provided in the <br /> drawings. Anti-flotation devices, if required, shall be <br /> manufacturer's standard precast concrete deadmen with the <br /> manufacturer's standard straps, anchor points and turnbuckles. <br /> Manufacturer shall provide calculations establishing the need, or <br /> not, for anti-flotation devices. <br /> Q:\Documents\Septic S,ystcm\Hm DOCUMENTS\SEPTIC TANK PROJECT-SPECMCAMNSREV.doc <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.