Laserfiche WebLink
i <br /> 5 <br /> _ gC�RICULTURAL EX <br /> CAVAT��N i <br /> . A LICATION <br /> of <br /> SAN.fOAQUIN COUNTY COMA NU g�Rv DEVELOPMENT DEPARTMENT <br /> :. <br /> . RECLAMATION PLAN <br /> CHECKLIST-CONTINUED <br /> H Land : Describe the current land use{5)of the project site(e.g-,agriculture,timber,open space,recreation,etc.). <br /> [ ] points- <br /> 1. <br /> [ ] Aestheti Discuss the visual impact of the proposed mining operation from adjacent vantage <br /> J. Other I o ation: Include any other information requested by the lead agency to assess the environmental impacts of the <br /> [ ] propos peration. <br /> ll. DESCRIPTI OF PROPOSED MINING OPERATION applicable features: <br /> mining ration including the following <br /> ro 9 aosed pe <br /> railons5: On a map,show details of the proposed <br />� <br /> pTpertylpermit boundaries ore stockpile areas <br /> tailings ponds <br /> topsoil stockpile areas buildings <br /> siltation ponds pits(slope crestltoe and benches) <br /> i leach pads wasteloverburden dumps processing facilities <br /> haul roads other pertinent features <br /> l hazardous materials storage areas <br /> will <br /> I estimated annual production <br /> p(j B. Produ edule: Provin <br /> ide a else f The annual estimated quantities shou d be summedf orelproduct and rtoug'tve the totallanti i�pated <br /> be pha ,specify quantities by ph <br /> produ for the life of the mine. <br /> [� C. Minin an: A description of how mining will be done,including any or all of the following: <br /> i <br /> [XI <br /> 1. O e ati Plan: Provide the proposed initiation and termination dates of the mining operation. if seasonal,provide <br /> th reposed annual months of operation. <br /> 2. To of: Describe: <br /> l <br /> [Xl a. Stripping and handling techniques. <br /> [X] b. Location and volume of proposed soil stockpiles. <br /> [X) c. How soil stockpiles well be protected from erosion (e.g.,revegetated). <br /> 3, rburd nNV stelOre, Describe: <br /> [XI a. The proposed type of mine(open pit,quarry,placer,dredge,etc.). <br /> [Xj b. The typelsize of mininglhauling equipment to be used. <br /> ] c. The use,handling,and storage of explosives. <br /> ] d The proposed method for removing overburden and ore. <br /> [XI a The maximum anticipated depth of the mine. <br /> {Xj f. The maximum depth of mining,bench width, and maximum slope angles{illustrate with cross sections). <br /> [X) g If mining will be phased,describe each phase and concurrent reclamation. <br /> _ feoneerAs relatingto-the dissbar�of mi -waste-can.be_satisfied_by-ap�>7dDg-aCapy-Most �f the <br /> rt of waste discharge and waste discharge permit to the reclamation plan. <br /> Page 9 of 15 <br /> F:1Dmvc4%nning 3tion Forms% <br /> 4 Acuicultural Excavatim.doc (Revised 02-03-10) <br />