My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005752 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
11230
>
2600 - Land Use Program
>
PA-0500730
>
SU0005752 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:45 AM
Creation date
9/6/2019 10:29:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0005752
PE
2611
FACILITY_NAME
PA-0500730
STREET_NUMBER
11230
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
APN
00738011
ENTERED_DATE
11/3/2005 12:00:00 AM
SITE_LOCATION
11230 E JAHANT RD
RECEIVED_DATE
11/1/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\11230\PA-0500730\SU0005752\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> November 30,2005 <br /> NOA Project Number: E05116B <br /> �/6.0 PERCOLATION TEST INFORMATION <br /> L /6.1 Percolation Test Locations <br /> A site map indicating the locations of the percolation test holes is included as Plate 1 in the appendix <br /> of this report. <br /> L ✓6.2 Number of Percolation Tests <br /> Shallow percolation tests were conducted on each parcel of the subject property.A deep percolation <br /> test was conducted on parcels 3, 5 and 6. <br /> L / 6.3 Boring Preparation and Presaturation <br /> G A total of six shallow and three deep soil borings were advanced on the Site. The deep and shallow <br /> Lsoil borings were drilled with a truck-mounted deep rock augur rig on October 23, 24 and 30.2005. <br /> A 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> water in the percolation test boring. Approximately 2 inches of"pea gravel" were placed in the <br /> 4 bottom of the open soil boring, then the PVC pipe was installed on top of the gravel. "Pea Gravel" <br /> was then used to backfill in the annular space. <br /> LPresaturation of the percolation test holes occurred on the approximately 24 hours before the <br /> percolation tests. The depth of water used to pre-soak was 12 inches above the bottom of the <br /> Lborings. <br /> /6.4 Condition of Borings After Presaturation <br /> j After the 24-hour soak period, the presaturated holes were found to be intact on the day of testing <br /> lexcept for the deep holes on parcels 3, 5 and 6 which had water in the bottom on the day of testing. <br /> ` /6.5 Percolation Test Procedure <br /> _5 Percolation tests were conducted for the borings on November 24,25 and 31,2005 in accordance <br /> with the requirements of the EHD. A percolation test with a duration of four hours was performed <br /> for each hole. The last half an hour was observed by Ms. Lisa Medina, Senior Registered <br /> Environmental Health Inspector, EHD.The last half hour for the percolation tests conducted on <br /> November 25, 2005 on parcels 3 and 6 were observed by Mr. Ted Tasiopoulos, Registered <br /> Environmental Health Inspector, EHD. <br /> L <br /> L <br /> Lg <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.