Laserfiche WebLink
HAZARDOUS MATERIALS MANAGEMENT PLAN Page 3 of <br /> SPILLS OF LIQUID MATERIALS <br /> Plug and Patch Container Build Retention Dike <br /> Remove Sources of Ignition Position Container so as to Stop Leak <br /> L Reduce Pressure In Container/System ;J Isolate Area and Make Notifications <br /> W Neutralize Spilled Material _7 Secure System Valves and Closures <br /> Shutdown System Involved Apply Absorbent Material to Spill Area <br /> L N/A <br /> S <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> Shut off Valves/Systems Cover Spill to Prevent Spread <br /> Ventilate Area of Release1`�'� Neutralize Spilled Materials <br /> D Reduce Pressure in Container/System Position Container so as to Stop Leak <br /> Suppress Vapors with Water i Place Spilled Material into Drum or Bag <br /> Isolate Area and Make Notifications Isolate Area and Make Notifications <br /> E Remove Sources of Ignition J N/A <br /> C N/A <br /> SPILLS OTHER <br /> L <br /> AUTHORIZED CLEANUP COMPANIES SECTION 15 <br /> The following cleanup companies will be accessed in the event that our business must expend funds <br /> to clean up a hazardous materials spill. <br /> NAME 24-HOUR TELEPHONE NUMBER AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NUMBER AGREEMENT/CONTRACT NO. <br /> Submit Changes <br /> No Changes Necessary <br /> http://www.sjoesdata-org/action.lasso?-DatabaseFoes login&-layout=html&-response=-hmmp_upda... 10/4/200 <br />